Improvements to the Blackberry Bridge on Blackberry Drive will begin Tuesday, July 5 and will continue for approximately 30 days. Two-way traffic will be maintained during the construction and flaggers will be utilized. Improvements include a new poured concrete bottom under the bridge, removal of the stone veneer and application of a paint/stain to the existing concrete, replacement of the decorative railing on each side of the road, and sidewalk replacement.