Over the past two weeks the contractor has been working on ditching and linear grading along both sides of the road. The retaining wall construction is nearly completed. Roadway striping for maintenance of traffic was completed. Over the next two weeks the contractor will continue installing electrical conduit, ditch grading, retaining wall installation, underdrain installation, and curb installation.