Asphalt Resurfacing Program

2019 Asphalt Resurfacing Program

2019 Asphalt Resurfacing Program List
*Middleton Road from SR 91 to Stow Road will be performed after the City of Akron completes the waterline replacement project.

Contact Us

  1. Engineering


    Bradley Kosco
    City Engineer
    Ph: (330) 342-1197

    Nate Wonsick
    Assistant City Engineer
    Ph: (330) 342-1776

    Engineering Department
    115 Executive Parkway
    Suite 400
    Hudson, OH 44236
    Email
    Ph: (330) 342-1770

    Hours

    Monday - Friday
    7:30 a.m. - 4:00 p.m.

Project Description


The Asphalt Resurfacing Program is a yearly project that aims to improve roadways throughout the City. Roads are selected for the project based on a rating system, with roads receiving the poorest ratings targeted for improvement. Residents are notified before work begins, if their street is involved in the project.

2019 Program Awarded To:


Perrin Asphalt Company, Inc.
525 Dan St.
Akron, Ohio 44310 
(330)-253-1020

Resurfacing at Barlow Farm Park and Hudson Springs Paths

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8

Street Selection Process

 

The City of Hudson utilizes the Ohio Department of Transportation Pavement Condition Rating System to rate the streets. The City attempts to rate all asphalt streets every two years. This system provides a rating system from 0 - 100 (100 being the best). Most streets in the City that are scheduled to be resurfaced or reconstructed fall within a range of a 30-55 rating. Streets with the worst ratings get put to the top of the list.

For more information, click on the links below.
2019 Asphalt Roads to be Performed
2018 Asphalt Roads Performed
2017 Asphalt Roads Performed 
2016 Asphalt Roads Performed
Road Reconstruction Process with Cement Stabilization (pictures and information)
Asphalt Road Reconstruction FAQs