Sidewalks & Trails (Connectivity) Plan
The City of Hudson Sidewalks and Trails (Connectivity) Master Plan represents the continued effort to provide safe and practical community-wide bicycle and pedestrian connectivity in the community. The 2020 Connectivity Plan update has built on the past efforts of the 2013 and 2018 plans with an expanded engagement process to refine the connectivity opportunities and priorities within the community. The final Sidewalk and Trail Master Plan 2021-2025 was passed and adopted by City Council on February 16, 2021. See below for more information.
Details
-
Sidewalk & Trail Master Plan
- View the current Sidewalk & Trail Master Plan map here.
- View the full 2020 Sidewalk & Trail Master Plan here.
-
2022 Sidewalks Projects
Visit the Let's Talk Hudson page for detailed updates on current projects.
Completed Sidewalk Projects
To date, approximately 3 miles of sidewalks have been constructed.
Completed projects include:
- Herrick Park Drive (between Darrow Road and Lascala Drive)
- Darrow Road (Between Christine Drive and Brandywine Drive)
- Barlow Road (Between Darrow Road. and Nicholson Drive)
-
Proposed Sidewalk Projects - We Want to Hear From You!
The following proposed sidewalk projects are in the public input and design phases. Visit the links below to learn about the projects, submit feedback, or ask questions.
- Why do we have a Sidewalk and Trail Master Plan?
-
The plan assists the City of Hudson with funding and planning future sidewalks within Hudson. It helps us coordinate connections to other regional trails and walkways in our area with the goal of continually improving safe and practical community-wide bicycle and pedestrian activity in the community.
- Where can I find a map of the future budgeted sidewalks and trails?
-
- How do these projects benefit Hudson residents?
-
The proposed sidewalks and trails will allow residential neighborhoods to connect to parks, trails, to downtown, neighborhoods, and schools, therefore allowing safe, community-wide, non-vehicular travel in Hudson.
- What projects will we see constructed in 2021?
-
- Herrick Park Drive from SR 91 to Lascala Drive
- SR 91 just north of Norton Road to Terex Road
- SR 91 Garden Lane to the Twinsburg Township line
- SR 303 from W. Case to Nicholson Drive
- W. Barlow Road from SR 91 to east of the railroad tracks
Visit www.hudson.oh.us/2021SidewalkProjects for more information.
- Is there a direct fee or charge to the adjacent property owners for this sidewalk work?
-
No. The sidewalk work and any other public capital incidental construction items on this project are budgeted within the City of Hudson’s Annual Budget.
- Will I still receive packages, deliveries, and US Mail Service during construction?
-
Yes. The contractor will need to provide access to these services during the construction of the project. Except for when a driveway is being constructed, the owner should notify the City of any large deliveries one day in advance of delivery.
- Will I still receive refuse and trash pickup service?
-
Yes. The Contractor will need to provide access to this service during the construction of the project.
- Will my driveway access be disrupted?
-
Yes. The Contractor will provide advance notice of 24 hours for any driveway that will be out of service and non-accessible. The contractor will be required to provide a parking location for two vehicles for up to 10 hours of closing the driveway, at each property. If the driveway cannot be opened within 10 hours to vehicle traffic, the contractor shall provide parking for vehicles, but no longer than 24 hours.
- Who do I call if I have an issue?
-
The City will provide a 24-hour contact number from the contractor doing the work at the start of construction.
- What if I have a private irrigation system or underground dog fence within the City right-of-way? Will I need to relocate it?
-
Yes. The City will send out a letter in advance of the project bidding to notify residents who will need to relocate their private irrigation and dog fences prior to construction.
Project Resources
- 2018 Connectivity Plan
- 2018 Priority Rankings (See Appendix D on page 14 for the priority list. See page 5, section IV for an explanation of the scoring system.)