Veterans Trail Phase 2

As part of the Connectivity Plan and the proposed Village of Boston Heights to Hudson Trail, the City of Hudson and the Ohio Department of Natural Resources considered construction of a portion of the Heights to Hudson Trail which would consist of a 10-foot wide asphalt path.The trail was originally planned for construction in 2017-2018. 

Trail alignment:

  • Hines Hill Rd. and W. Prospect St. intersection, to:
  • W. Prospect St. and Hunting Hollow Dr., to, 
  • Hunting Hollow Dr. and Valley View Rd. intersection,
  • Ending at the intersection of Valley View and Darrow Rd. 


Contact Information:


Andrew McAvinew, EIT, Engineering Project Designer
Phone: (330) 342-1770
Email

Current Status


The City is currently analyzing alternative trail alignments for Veterans Trail Phase 2.

  • Survey work is being performed along Valley View Rd, from the Darrow Rd intersection to Hunting Hollow Dr.
  • The City is seeking the Hunting Hollow Drive residents’ input on the proposed trail alignment. Three possible alignments along Hunting Hollow Drive were provided to the residents. A form was included for them to select their preferred option and return for use in the City’s analysis.
  • Trail alignments from the Hunting Hollow Dr. and W. Prospect St. intersection to Hines Hill Rd. are currently being investigated.

Hunting Hollow Drive

A portion of Veterans Trail Phase 2 connecting Valley View Road and Prospect Street will utilize Hunting Hollow Drive. The City is currently seeking the Hunting Hollow Drive residents’ input on the proposed trail alignment. Three possible alignments along Hunting Hollow Drive were provided to the residents. A form was included for them to select their preferred option and return for use in the City’s analysis. Click here to view the Trail Options Letter mailed on August 9, 2017.

Hunting Hollow Trail Concept Plan, click image for a larger view:

Veterans Trail Phase 2 Concept Plan

Hunting Hollow Trail Three Options:

  • Option 1 is a 10-ft wide sidewalk along Hunting Hollow Drive. The path would be located on the south side of the road, within the City’s right-of-way.
  • Option 2 is a 12-ft wide asphalt path. This option would be located in the Ohio Edison easement behind the homes along the turnpike.
  • Option 3 is to add “Share the Road” signs in both directions along Hunting Hollow Drive. “No Parking” signage along the north side of the road will be considered.